Repository navigation
[Native] Export reusable binaries and close stack review gaps - #58
Merged
rhorvath02 merged 9 commits intoOct 25, 2026
Merged
Conversation
This was referenced Oct 22, 2026
rhorvath02
force-pushed
the
review/boblib-native-calibration
branch
from
October 22, 2026 08:44
6a5be55 to
212110b
Compare
# Conflicts: # .github/workflows/ci.yml
raorjun
previously approved these changes
Oct 23, 2026
raorjun
approved these changes
Oct 24, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Purpose
Reuse native binaries with the FMU calibration contract, and complete the PR stack’s review fixes so missing calibration fails explicitly and maneuver limit exits retain usable results.
Changes
terminationStatusto distinguish settled results, limits and timeouts; invalid settings still fail.Validation
Seven new full-vehicle exit-status tests passed. The local additional suite completed with 970 passes and eight skips; its missing-NumPy and missing-road-calibration failures both passed targeted retests after correcting the environment and fixture respectively. The affected initialization snapshot was updated only after verifying that
terminationStatus=0was the sole added numeric variable and all existing initialized values remained within the unchanged tolerances.Final-revision PR CI passed all five jobs on
f35fa2f, including 984 passed / 6 skipped / 0 failed component checks. Five skips are exercised by the separate FMU job; the remaining calibration rebuild comparison requires explicitly supplied matching artifacts. The full release gate is still running its final component stage; translation, initialization, physics, signal and FMU stages passed.Vehicle comparison and its scope. Complete architecture-catalog artifact acceptance and exhaustive rendered-diagram acceptance remain outside these results.