Skip to content

chore(release): prepare auto-4b57341d25-663b4b05a36d - #258

Closed
github-actions[bot] wants to merge 3 commits into
mainfrom
release/auto-4b57341d25-663b4b05a36d
Closed

github-actions[bot] wants to merge 3 commits into
mainfrom
release/auto-4b57341d25-663b4b05a36d

Conversation

@github-actions

@github-actions github-actions Bot commented Oct 23, 2026 •

Copy link
Copy Markdown
Contributor

Issue

Refs #257

Summary

Prepare releases/auto-4b57341d25-663b4b05a36d.json from 663b4b05a36df3ed65a97a22a87b7a82b97402cf. Versions, internal requirements, workspace mappings, dependency sums, and accumulated module notes were generated automatically.

Module Target Previous release
. v1.3.0 v1.2.0
commons/awssdk v1.3.0 commons/awssdk/v1.2.0
commons/dynamodb v1.3.0 commons/dynamodb/v1.2.0
commons/metadata v1.3.0 commons/metadata/v1.2.0
commons/regex v1.3.0 commons/regex/v1.2.0
logger v1.3.0 logger/v1.2.0
metrics v1.3.0 metrics/v1.2.0
parameters v1.3.0 parameters/v1.2.0
signer v1.3.0 signer/v1.2.0
jmespath v1.3.0 jmespath/v1.2.0
datamasking/kms v1.3.0 datamasking/kms/v1.2.0
datamasking v1.3.0 datamasking/v1.2.0
kafka/protobuf v1.3.0 kafka/protobuf/v1.2.0
kafka/avro v1.3.0 kafka/avro/v1.2.0
kafka v1.3.0 kafka/v1.2.0
batch v1.3.0 batch/v1.2.0
idempotency v1.3.0 idempotency/v1.2.0
idempotency/cache v1.3.0 idempotency/cache/v1.2.0
parser v1.3.0 parser/v1.2.0
validation v1.3.0 validation/v1.2.0
eventhandler/http v1.3.0 eventhandler/http/v1.2.0
eventhandler/appsyncevents v1.3.0 eventhandler/appsyncevents/v1.2.0
eventhandler/appsyncgraphql v1.3.0 eventhandler/appsyncgraphql/v1.2.0
eventhandler/bedrock v1.3.0 eventhandler/bedrock/v1.2.0
eventhandler/http/metrics v1.3.0 eventhandler/http/metrics/v1.2.0
eventhandler/http/tracer v1.3.0 eventhandler/http/tracer/v1.2.0
tracer v1.3.0 tracer/v1.2.0

Unified project version: v1.3.0. All maintained public modules are included, even when only one component changes. One project Release contains the consolidated notes and full version table; independent module tags identify the same commit.

Historical notes inferred from PR titles and changed paths: None. Review these summaries, initial scope statements, and direct-commit acknowledgements in the plan.

Testing

Internal dependency metadata was tidied with CGO disabled and no module-file replacements. Native contribution, module, and documentation PR checks are activated for this exact head; review their results before merging. If GitHub requires maintainer authorization, select Approve workflows to run in this PR.

Risks and compatibility

Automatic publication after merge and successful main checks: enabled. Merging this preparation PR authorizes the frozen release batch; the workflow publishes with GoReleaser and closes the tracking issue. Squash or merge onto the recorded source SHA. If main advances, rerun preparation against main and replace this stale PR. Tags are never rewritten.

Release notes

  • repository | maintenance | Prepare reviewed module versions and accumulated release notes.
  • tracer/xray | maintenance | Synchronize internal dependencies with this release batch.
  • examples | maintenance | Synchronize internal dependencies with this release batch.
  • integration | maintenance | Synchronize internal dependencies with this release batch.

Integration links


View with [code]smith Autofix with [code]smith
Need help on this PR? Tag @codesmith-bot with what you need.

@jinxiao

jinxiao commented Oct 23, 2026

Copy link
Copy Markdown
Contributor

Release-plan review: v1.3.0 includes exactly the 27 maintained public modules at one version; the frozen X-Ray adapter remains excluded. The plan freezes source 663b4b0 and preserves Go 1.27.3 plus the reviewed dependency patches. Corrected the unreleased note imported from PR #242: the Logger stacks API remains Preview but is included in this new cohort, rather than claiming it is main-only. Re-rendered all notes and validated the plan against Git history and the manifest. No published Release or old notes were edited. Merge/publication remains conditional on the exact final preparation head and merged main passing all release gates.

@jinxiao

jinxiao commented Oct 23, 2026

Copy link
Copy Markdown
Contributor

Release review found an additional Critical advisory in the pinned protobufjs reference-tool dependency during the read-only npm audit. No tags or Release have been published. Closing this unmerged plan so the fix can ship through a source PR first, then a refreshed plan against the new main source. Keep release tracking issue #257 open and reuse it for the same v1.3.0 cohort. The Go runtime security fixes remain merged in #256.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant